#16 drainage project has been completed. A total of 400 feet of 8inch diameter drainpipe was installed right of #16 green. The old drain pipe which was removed; was crushed, plugged, filled with tree roots and not working properly. After this repair, water will drain much quicker after heavy rains and allow the golf course to be playable.