Wednesday, March 17, 2021

#16 Drainage Project

#16 drainage project has been completed.  A total of 400 feet of 8inch diameter drainpipe was installed right of #16 green.  The old drain pipe which was removed; was crushed, plugged, filled with tree roots and not working properly.  After this repair, water will drain much quicker after heavy rains and allow the golf course to be playable.